Heat recovery steam generators for two or three pressures as a part of single and double combined cycle units as well as built-ups for the existing electric power plants as a part of combined cycle plants plus HRSG.
Special design of economizer provides a complete uniformity in the fields of velocity and temperature of mediums in the bank as well as eliminates the problem of medium boiling in tubes.
PJSC Krasny Kotelshchik provides warranty service and supplies necessary spare parts for the warranty period of the equipment operation. The service program encompasses a broad spectrum of services throughout the entire service life of the equipment: monitoring its condition, diagnostics of its status, fault prevention (during scheduled shutdowns), repairs, supply and replacement with spare parts and components, while guaranteeing high quality and reliability of operation.